Licensed builders serving Newcastle, Lake Macquarie & the Hunter

Service

External Cladding & Recladding in Newcastle

Weatherboard, fibre cement, timber and composite cladding, installed over a proper drainage cavity.

External wall framing with insulation and sarking ready for cladding installation

Cladding is the single fastest way to change how a house looks, and one of the easiest to get wrong. The board is the visible part; the waterproofing behind it is the part that decides whether the wall lasts. We install over a drained and vented cavity with correct flashings so moisture that gets in can get back out.

What this covers

  • Scyon, James Hardie and fibre cement cladding
  • Weatherboard and traditional timber cladding
  • Composite and aluminium cladding systems
  • Full recladding of tired or failing facades
  • Drainage cavity, sarking and flashing detailing
  • Feature panels, board-and-batten and mixed materials

Why people call us for this

Cladding fails at the edges, not in the middle of the wall: a window head with no flashing over it, a bottom board sitting in the dirt, a joint left with no room for the board to move. Each one lets water behind the board and holds it against your frame. We flash every opening and penetration so each lap sheds water outward, keep the bottom edge clear of the ground, set joints and gaps to the product sheet, and fix every board back to a stud.

Every job gets an itemised written quote, a written program and one point of contact from the first site visit through to handover.

Get a quote for your cladding

Tell us what you are planning and we will come out for a look. Free, and with no obligation to go ahead.

Advice

Reading on cladding

Practical guides we have written on this, drawn from jobs around Newcastle and the Hunter.

Read all our building advice

FAQ

Cladding questions

Can you reclad over existing walls?

Sometimes, but not usually the right call. Stripping back lets us inspect the frame for rot or termite damage and install a proper drainage cavity. We will tell you honestly what we find once the old cladding is off.

How long does recladding a house take?

A typical single-storey home takes 3 to 5 weeks depending on size, access and how much repair work turns up behind the old cladding.

Get Started

Planning a build? Let us take a look.

Tell us what you have in mind and we will come out, walk the site with you and give you an honest, itemised quote. No obligation, no pressure.