Bathroom Renovations in Newcastle

Certified waterproofing, correct falls and a fit-out that will not leak into the room next door.

Renovated Newcastle bathroom with a back to wall bath, wall hung vanity, heated towel rail and a walk-in shower under a skylight

A bathroom is the one room in the house where a shortcut shows up as a repair bill. Waterproofing has to be certified, the floor has to fall to the waste, and the membrane has to turn up the wall far enough. We do that part by the book, because the tiling on top of it is the cheap bit to redo and the wall framing underneath is not.

What this covers

  • Certified waterproofing to AS 3740
  • Floor falls, wastes and screeds set correctly
  • Wall and floor tiling
  • Vanities, shower screens and tapware
  • Niches, frameless showers and floating vanities
  • Accessible and step-free bathroom conversions

What actually happens between demolition and the first tile

Once the old bathroom is out, the floor and walls get checked before anything new goes in. Rotten bottom plates, a soft patch in a timber floor, or a slab that has been chased for an old waste all get fixed now, because the membrane is only as good as what it sticks to. The plumber and electrician rough in, the walls are lined with fibre cement sheet, and the floor is screeded to its falls. Then the wet area gets primed, and bond breakers go into every corner and junction so the membrane can flex where the building moves instead of tearing.

The membrane goes on in two coats, the second at right angles to the first so there are no thin spots, with a puddle flange at the waste and a water stop set into the floor at the screen line and the doorway. Between those coats, and again before any tile is laid, the product has to cure. Every membrane has a data sheet that sets a minimum time for that, and it gets longer on a cold or humid Hunter morning. Tile over it early and the membrane stays soft underneath, the adhesive never bonds properly, and the first sign is a damp skirting board in the hallway months later. We wait, and the program allows for it.

  • Substrate checked and repaired before any lining goes on
  • Fibre cement wall linings in the wet area, joints set and primed
  • Bond breakers at every floor to wall junction and internal corner
  • Puddle flange at the waste, water stops at the screen line and door
  • Two membrane coats with the cure time the data sheet sets between them
  • Membrane inspected and signed off before tiling starts

Setting the falls and the waste before a tile goes down

A bathroom floor is not flat, and it should not be. The shower floor falls to its waste, and where the room has a floor waste the rest of the floor falls to that too. Both slopes are set in the screed with a level and a straight edge before the membrane goes on, not made up later by the tiler with a thicker bed of adhesive. Get the fall wrong and water sits in the corner of the shower, the grout goes black, and someone stands in a puddle every morning. Get it right and the floor drains itself, which is the whole point of the exercise.

Where the waste sits decides everything above it. On a slab, moving a waste means cutting concrete and re-running the drain, so we confirm the position with the plumber before the screed is even mixed. On a timber floor there is more freedom, but the floor build-up has to be worked out so the finished tile lands level with the hallway rather than a step above it. A linear channel drain along the back wall of the shower lets the floor fall one way in a single plane, which suits large format tiles and is the usual choice for a level entry shower.

  • Waste positions confirmed with the plumber before the screed goes down
  • Shower floor and main floor falls set in the screed and checked with a level
  • Slab cutting and drain re-runs where the waste has to move
  • Floor build-up worked out on timber floors so the tile meets the hallway level
  • Linear channel drains for single plane falls and large format tiles
  • Centre wastes with four way falls where a channel drain is not wanted

What has to be in the wall before the lining goes on

A wall-hung vanity, a wall-mounted mixer, a shower screen and a grab rail all hang off the wall, and plasterboard and fibre cement sheet will not hold any of them on their own. Each one needs solid timber noggins or a steel plate fixed between the studs at exactly the right height, and that has to happen before the linings go on. We set out the vanity, the mixer body, the screen panel and the towel rail from the finished tile face, work back through the tile, the adhesive and the sheet to the stud, and put the backing where the fixings will actually land.

A niche is a recess in a wall that has to stay waterproof, so it gets framed as a box between the studs, lined, and membraned as part of the same system with the sill sloped back towards the shower so water cannot sit on it. Its position is set from the tile layout so the edges land on a grout line rather than through a cut tile. Wall-hung toilets need a steel frame and an in-wall cistern built into the stud wall with the flush plate and the outlet set before lining. Every one of these is a quick decision at framing and a strip-out if it is remembered at tiling.

  • Noggins and steel backing plates for wall-hung vanities and basins
  • Backing for shower screens, mixer bodies, towel rails and grab rails
  • Niches framed, lined and waterproofed with the sill falling to the shower
  • In-wall cistern frames for wall-hung toilets
  • Recessed mirror cabinets and shaving cabinets framed into the wall
  • Fixing positions recorded before lining so nothing is guessed at later

What changes when the bathroom has to be step-free or accessible

A level entry shower is mostly a floor problem. The shower floor still has to fall to its waste, so either the floor under the shower is recessed or the rest of the room is built up to meet it. On a slab that means cutting and lowering the shower base. On a timber floor it means framing a set-down into the floor or packing the floor outside the shower, and the answer depends on what is under there and how the door threshold and the hallway floor line up. We work that out and price it before you commit, because it is the part that decides whether the job is straightforward or not.

The rest is about the person using the room. Grab rails need backing in the wall at the height and position they will be fitted, so if an occupational therapist has written recommendations we build to them from the framing stage rather than surface-mounting rails later into plasterboard. Doorways can be widened and hinged doors swapped for sliding or cavity doors. A shower can be left open or fitted with a folding screen so a chair or a carer can get in. A handheld shower on a rail, a wall-hung vanity with knee clearance underneath, and a lever mixer at the right height all fit into an ordinary looking bathroom without announcing themselves.

  • Level entry showers with a set-down or a built-up floor, worked out per house
  • Grab rail backing set at framing, to an occupational therapist plan where there is one
  • Wider doorways, sliding doors and cavity doors
  • Open showers or folding screens for chair and carer access
  • Wall-hung vanities with clearance underneath, lever mixers and handheld showers
  • Floor tiles chosen for slip resistance in the wet area

Why people call us for this

A bathroom leak is usually found by the room next door. By the time the paint on the far side of the wall blisters, the fix is a strip-out, so we do the sequence in the right order, wait out the cure times, and have the waterproofing signed off before it is covered. You lose the room for the whole program, so we tell you when the water goes off and when it comes back on, and help you plan around it if there is no second bathroom.

Every job gets an itemised written quote, a written program and one point of contact from the first site visit through to handover.

Get a quote for your bathroom renovations

Tell us what you are planning and we will come out for a look. Free, and with no obligation to go ahead.

Recent Work

Bathrooms we have built

Finished bathrooms around Newcastle, plus the stage nobody photographs. The membrane shot is the one that decides whether everything on top of it lasts twenty years.

Renovated bathroom with a back to wall bath, backlit tiled niche, large format grey wall tiles and a linear floor waste
Bath alcove and backlit niche
Walk-in shower with a skylight above, a backlit niche, black mixer and a linear channel drain set into dark floor tiles
Walk-in shower, skylight and channel drain
Wall hung vanity in a timber finish with a vessel basin, wall mounted black mixer and a three door mirrored shaving cabinet
Wall hung vanity and shaving cabinet
Blue waterproofing membrane applied to a bathroom floor and shower walls with the shower base falls formed and the hob turned up
Membrane on, falls formed, before tiling
Compact bathroom and laundry with a framed shower screen, toilet suite, bench with laundry tub and a three in one heat lamp
Compact bathroom and laundry combination

Advice

Reading on bathroom renovations

Practical guides we have written on this, drawn from jobs around Newcastle and the Hunter.

Costs & Budgeting

Bathroom Renovation Costs in Newcastle

Realistic bathroom renovation costs for Newcastle and Lake Macquarie homes, why waterproofing is not the place to save, and what changes the price.

Read all our building advice

FAQ

Bathroom Renovations questions

How long does a bathroom renovation take?

Around 3 to 4 weeks for a standard bathroom. Waterproofing needs curing time between coats and that cannot be rushed without risking the whole job.

Do you provide a waterproofing certificate?

Yes. Waterproofing is carried out by a licensed applicator and you receive the certificate for your records. Keep it, because it matters if you ever sell.

Can I use the bathroom at all during the renovation?

No. From the day the strip-out starts until the grout and silicone have cured, the room is a building site with the water off and the floor open. If the house has a second bathroom or an outside toilet, that is what you use. If it does not, tell us at quote stage so we can talk through the options, including a hired portable toilet, before the program is set.

Can you move the toilet or shower to a different wall?

Often, but it depends what the floor is. On a slab the drain has to be cut into the concrete and re-run, which is more work but is routine. On a timber floor the drain runs under the joists and the move is simpler. Either way the waste position has to be fixed before the screed goes down, so it is a decision to make at the design stage, not once the tiles arrive.

What happens if you find water damage once the old tiles come off?

It is common in an older bathroom, especially around the shower and behind the bath. Wet bottom plates, rotten studs or a soft patch of floor all get shown to you with photos before they are covered, and the repair is priced separately so you can see what it is. Nothing gets lined over until it is dry and sound. Waterproofing a rotten wall just hides the rot for a few more years.